Required Permit Drawings

Required Permit Drawings

 

 

The following list can be used as a guide when preparing drawings for submission for a building permit. For a project designed under Part 9 of the Ontario Building Code, professional design is not required. All drawings must be to scale.

 

 

 

 As of January 1, 2006 –The designer that prepares the permit drawings is responsible to ensure that they provide sufficient information to the Builder to ensure compliance with the requirements of the Ontario Building Code. All designers will be required to show proof of meeting the qualifications required by the Ministry of Housing.

 

 

 

  Any project designed under Part 3 of the Ontario Building Code (assembly occupancy, institutional, large buildings over 600 square metres and multiple dwellings) require professional design by an Architect and/or a Professional Engineer.

 

 

 

Site Plan 

 

 

 

  ڤ  The location of all existing and proposed buildings.

      ڤ  Must show all property boundaries, adjacent road and water bodies. Setbacks must be clearly marked.

      ڤ  The existing and proposed drainage patterns and means of storm water disposal must be illustrated.

      ڤ All existing and proposed services on site (septic system, well, hydro).

      ڤ Proposed and existing parking areas, width of traffic flow and proposed snow storage area.

      ڤ North map position displayed.

 

 

 

Floor Plan

 

 

 

ڤ  The floor plan for each storey (including basement) must be separate.

      ڤ  All rooms must be labeled to illustrate their intended use.

      ڤ  The location of doors, windows, placement of plumbing fixtures and stairs must be clear.

      ڤ  If the project is an addition, the layout of the existing portion is also required.

     

 

 

 

 *The structural information for roof or floor /framing information and any mechanical and electrical    specifications may be illustrated on the floor plan for simple projects.

 

 

 

 

Foundation Plan

 

 

 

 ڤ  Soil conditions and water table.

      ڤ  The size and type of materials used.

      ڤ  The location and size of all footings, including column and pier footings.

      ڤ  The location and type of any required drainage should be illustrated.

 

 

 

*Plumbing and electrical services can be added on this drawing.

 

 

 

Framing Plan

 

 

 

     ڤ  The size, type and location of all structural members must be clear. (Lintel details required)

      ڤ  The spans for beams must be indicated.

      ڤ  The specifications for engineered lumber must be provided.

      ڤ  All loads must be safely transferred to the foundation; sufficient information must be provided.

 

 

 

 

Roof Plan

 

 

 

 ڤ  Roof slope and any roof mounted equipment must be shown. 

 

 

 

Cross-Sections and Details

 

 

 

 ڤ  Cross sections will illustrate all materials that make up the wall, floor and roof systems. Adequate information to determine the location of; insulation, air barrier, vapour barrier, structural members,      sheeting, backfill height, stairs, bracing and required connections must be shown.

 

 

 

Building Elevations

 

 

 

 ڤ  Show proposed grade at each elevation of building. Windows, doors, roof slopes, decks, chimneys, etc…

 

 

 

 

Electrical

 

    ڤ  Show location of lights, smoke alarms, carbon monoxide detectors, required switching, etc…

 

 

 

Plumbing

 

 

 

      ڤ  Indicate locations of fixtures

      ڤ  Provide information on fixture units, pipe and vent sizing.

 

 

 

Heating, Ventilation and Air Conditioning – Building Services

 

 

 

 ڤ  Location and description of all HVAC units including clearance details.

      ڤ  Indicate locations of supply and return air openings.

      ڤ  Provide information and specifications on HVAC units.

 

 

 

 

 

Any changes to the original plans are required to be approved prior to inspection

 

 

 

 

 

REQUIREMENTS

 

 

 

 Complete application, required plans and Permit Fees shall be paid on a request for any permit.

 Where a partial permit has been issued in order to expedite work; partial approval shall not be construed
 
to authorize construction beyond the submitted plans nor that approval for the remainder of the construction will.
 
necessarily be granted

 

 

 

 Permits are valid for a 12 month period in which a renewal fee is required where applicable and provided
 
construction has commenced.

 

 

 

 No Building Permit Application will be accepted without a septic approval from the Thunder Bay District
 
Health Unit; where applicable.

 

 

 

An Entrance Permit may be required in addition to a building permit (Gillies Roads Department
 
and/or M.T.O.)

 

 

 

An Electrical Permit may be required in addition to a building permit (Electrical Safety Authority)

 

 

 

Set Back Restrictions:

 

 

 

Centre line of street or road allowance is 55 ft (18m)

 

 

 

 *Property fronting on Hwy 588, 608 or 595 must meet additional setback restrictions (M.T.O.)

 

 

 

 Side Property line is 10 ft (3m)

 

 

 

*Building near or on the water have exceptions and requires an additional environmental study

 

 

 

Required Permit Drawings

 

 

 

  The following list can be used as a guide when preparing drawings for submission for a building permit. For a project designed under Part 9 of the Ontario Building Code, professional design is not required. All drawings must be to scale.

 

 

 

   As of January 1, 2006 –The designer that prepares the permit drawings is responsible to ensure that they provide sufficient information to the Builder to ensure compliance with the requirements of the Ontario Building Code. All designers will be required to show proof of meeting the qualifications required by the Ministry of Housing.

 

 

 

 Any project designed under Part 3 of the Ontario Building Code (assembly occupancy, institutional, large buildings over 600 square metres and multiple dwellings) require professional design by an Architect and/or a Professional Engineer.

 

 

 

 ڤ  The location of all existing and proposed buildings.

      ڤ  Must show all property boundaries, adjacent road and water bodies. Setbacks must be clearly marked.

      ڤ  The existing and proposed drainage patterns and means of storm water disposal must be illustrated.

      ڤ All existing and proposed services on site (septic system, well, hydro).

      ڤ Proposed and existing parking areas, width of traffic flow and proposed snow storage area.

      ڤ North map position displayed.

     

 

 

 

Floor Plan

 

 

 

ڤ  The floor plan for each storey (including basement) must be separate.

      ڤ  All rooms must be labeled to illustrate their intended use.

      ڤ  The location of doors, windows, placement of plumbing fixtures and stairs must be clear.

      ڤ  If the project is an addition, the layout of the existing portion is also required.

 

 

 

The structural information for roof or floor /framing information and any mechanical and electrical specifications may be illustrated on the floor plan for simple projects.

 

 

 

Foundation Plan

 

 

 

    ڤ  Soil conditions and water table.

      ڤ  The size and type of materials used.

      ڤ  The location and size of all footings, including column and pier footings.

      ڤ  The location and type of any required drainage should be illustrated.

 

 

 

 *Plumbing and electrical services can be added on this drawing.

 

 

 

Framing Plan

 

 

 

    ڤ  The size, type and location of all structural members must be clear. (Lintel details required)

      ڤ  The spans for beams must be indicated.

      ڤ  The specifications for engineered lumber must be provided.

      ڤ  All loads must be safely transferred to the foundation; sufficient information must be provided.

 

 

 

 

Roof Plan

 

 

 

 ڤ  Roof slope and any roof mounted equipment must be shown. 

 

 

 

Cross-Sections and Details

 

 

 

   ڤ  Cross sections will illustrate all materials that make up the wall, floor and roof systems. Adequate information to determine the location of; insulation, air barrier, vapour barrier, structural members,      sheeting, backfill height, stairs, bracing and required connections must be shown.

 

 

 

Building Elevations

 

 

 

   ڤ  Show proposed grade at each elevation of building. Windows, doors, roof slopes, decks, chimneys, etc…

 

 

 

Electrical

 

 

 

ڤ  Show location of lights, smoke alarms, carbon monoxide detectors, required switching, etc…

 

 

 

Plumbing

 

 

 

 ڤ  Indicate locations of fixtures

      ڤ  Provide information on fixture units, pipe and vent sizing.

     

 

 

 

Heating, Ventilation and Air Conditioning – Building Services

 

 

 

      ڤ  Location and description of all HVAC units including clearance details.

      ڤ  Indicate locations of supply and return air openings.

      ڤ  Provide information and specifications on HVAC units.

_________________________________________________________________________________________

 

 

 

*Any changes to the original plans are required to be approved prior to inspection

 

 

 

REQUIREMENTS

 

 

 

Complete application, required plans and Permit Fees shall be paid on a request for any permit.
 
 
 Where a partial permit has been issued in order to expedite work; partial approval shall not be construed
 
to authorize construction beyond the submitted plans nor that approval for the remainder of the construction will.
 
necessarily be granted

 

 

 

 
 Permits are valid for a 12 month period in which a renewal fee is required where applicable and provided
 
construction has commenced.

 

 

 

 No Building Permit Application will be accepted without a septic approval from the Thunder Bay District
 
Health Unit; where applicable.

 

 

 

An Entrance Permit may be required in addition to a building permit (Gillies Roads Department
 
and/or M.T.O.)

 

 

 

An Electrical Permit may be required in addition to a building permit (Electrical Safety Authority)

 

 

 

Set Back Restrictions:

 

 

 

 

 


 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 Centre line of street or road allowance is 55 ft (18m)
 
 
 
 
 
 
 
 *Property fronting on Hwy 588, 608 or 595 must meet additional setback restrictions (M.T.O.)
 
 
 
 
 
 
 Side Property line is 10 ft (3m)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 *Building near or on the water have exceptions and requires an additional environmental study
 
 


Required Permit Drawings

 

      The following list can be used as a guide when preparing drawings for submission for a building permit. For a project designed under Part 9 of the Ontario Building Code, professional design is not required. All drawings must be to scale.

    As of January 1, 2006 –The designer that prepares the permit drawings is responsible to ensure that they provide sufficient information to the Builder to ensure compliance with the requirements of the Ontario Building Code. All designers will be required to show proof of meeting the qualifications required by the Ministry of Housing.

    Any project designed under Part 3 of the Ontario Building Code (assembly occupancy, institutional, large buildings over 600 square metres and multiple dwellings) require professional design by an Architect and/or a Professional Engineer.

 

Site Plan 

 

      ڤ  The location of all existing and proposed buildings.

      ڤ  Must show all property boundaries, adjacent road and water bodies. Setbacks must be clearly marked.

      ڤ  The existing and proposed drainage patterns and means of storm water disposal must be illustrated.

      ڤ All existing and proposed services on site (septic system, well, hydro).

      ڤ Proposed and existing parking areas, width of traffic flow and proposed snow storage area.

      ڤ North map position displayed.

     

Floor Plan

 

      ڤ  The floor plan for each storey (including basement) must be separate.

      ڤ  All rooms must be labeled to illustrate their intended use.

      ڤ  The location of doors, windows, placement of plumbing fixtures and stairs must be clear.

      ڤ  If the project is an addition, the layout of the existing portion is also required.

     

      *The structural information for roof or floor /framing information and any mechanical and electrical    specifications may be illustrated on the floor plan for simple projects.

 

Foundation Plan

 

      ڤ  Soil conditions and water table.

      ڤ  The size and type of materials used.

      ڤ  The location and size of all footings, including column and pier footings.

      ڤ  The location and type of any required drainage should be illustrated.

 

      *Plumbing and electrical services can be added on this drawing.

 

Framing Plan

 

      ڤ  The size, type and location of all structural members must be clear. (Lintel details required)

      ڤ  The spans for beams must be indicated.

      ڤ  The specifications for engineered lumber must be provided.

      ڤ  All loads must be safely transferred to the foundation; sufficient information must be provided.

 

Roof Plan

 

      ڤ  Roof slope and any roof mounted equipment must be shown. 

     

 

Cross-Sections and Details

 

      ڤ  Cross sections will illustrate all materials that make up the wall, floor and roof systems. Adequate information to determine the location of; insulation, air barrier, vapour barrier, structural members,      sheeting, backfill height, stairs, bracing and required connections must be shown.

 

Building Elevations

 

      ڤ  Show proposed grade at each elevation of building. Windows, doors, roof slopes, decks, chimneys, etc…

 

Electrical

 

      ڤ  Show location of lights, smoke alarms, carbon monoxide detectors, required switching, etc…

 

Plumbing

 

      ڤ  Indicate locations of fixtures

      ڤ  Provide information on fixture units, pipe and vent sizing.

     

Heating, Ventilation and Air Conditioning – Building Services

 

      ڤ  Location and description of all HVAC units including clearance details.

      ڤ  Indicate locations of supply and return air openings.

      ڤ  Provide information and specifications on HVAC units.

_________________________________________________________________________________________

 

*Any changes to the original plans are required to be approved prior to inspection

_________________________________________________________________________________________

 

REQUIREMENTS

 
 
 
 
 
 Complete application, required plans and Permit Fees shall be paid on a request for any permit.
 
 
 Where a partial permit has been issued in order to expedite work; partial approval shall not be construed
 
to authorize construction beyond the submitted plans nor that approval for the remainder of the construction will.
 
necessarily be granted
 
 
 
 
 
 
 
 Permits are valid for a 12 month period in which a renewal fee is required where applicable and provided
 
construction has commenced.
 
 
 
 
 
 
 
 
 
 
 No Building Permit Application will be accepted without a septic approval from the Thunder Bay District
 
Health Unit; where applicable.
 
 
 
 
 
 
 
 
 An Entrance Permit may be required in addition to a building permit (Gillies Roads Department
 
and/or M.T.O.)
 
 
 
 
 
 
 
 
 
 
 
 
 An Electrical Permit may be required in addition to a building permit (Electrical Safety Authority)

 
 
 
 
 
 
 
 
 Set Back Restrictions:
 
 
 
 
 
 
 
 
 
 
 
 
 
 Centre line of street or road allowance is 55 ft (18m)
 
 
 
 
 
 
 
 *Property fronting on Hwy 588, 608 or 595 must meet additional setback restrictions (M.T.O.)
 
 
 
 
 
 
 Side Property line is 10 ft (3m)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 *Building near or on the water have exceptions and requires an additional environmental study