Building Permit Checklist

The Township of Gillies

R.R. #1, 1092 Hwy. 595
Kakabeka Falls, ON    P0T 1W0
(807) 475-3185  Fax (807) 473-0767

Required

Attached

 

 

 

1)  Septic approval from the Thunder Bay District Health Unit is required prior to building permit application where applicable.

 

 

 

2) Entrance Permit required from the Township of Gillies or M.T.O. where applicable

 

 

 

3) Electrical Permit required from Electrical Safety Authority where applicable.

 

 

 

4) Approvals required from Lakehead Region Conservation Authority where applicable.  Floodplain restrictions may apply.  Reference maps are available at the Gillies Township Office.

 

 

 

5) Application form completely filled out, signed and appropriate fees paid.

    Building Code Act Section 8. (1.1)   -The Building Permit Application is now a provincially prescribed form and is mandatory as of July 1, 2005. The form can be downloaded at www.obc.mah.gov.on.ca   (publications). All fields that are applicable must be filled in before the application will be accepted.

 

 

 

6)   a) Site plan (to scale) showing the location of all buildings (existing and proposed) and all services, including sewage system, water supply and electrical service on the lot in relation to property lines.

 

 

 

  b) Adequate elevations drawings in order to demonstrate the grading and drainage.

 

 

 

7) Two complete sets of structural drawings including:  

  • Foundation details
  • Wall framing details
  • Cross-section
  • Floor plan
  • Roof plan
  • Elevation Drawings
  • Heating, Ventilation, Air Conditioning details
  • Plumbing details
  • Electrical details

Must be legible and drawn to scale

(if application is for an addition, drawings of the proposed addition in relation to the existing structure is required)



 

New Dwelling applications will not be accepted without all Items attached to the application form.

Allow a minimum of 5 days for processing of the application for Building Permit. You will be notified by telephone once the permit has been issue.

Applicant is responsible to ensure compliance with all Applicable Laws and is responsible for requesting the required inspections with 48 hours notice.

Applicant's Signature_________________________

C.B.O.   ____________________________   

dd/mm/yyyy

Date:____ /____/_____

Permit Fee _____________ (payable upon submission of application)    Class _____ Permit      issued   ٱ   on  Date: _____________